Turn Energy into a
Managed Asset.
Energy is no longer a fixed cost—it's a market. Secure critical operations and arbitrage spot prices with an industrial BESS.
Liability vs
Asset.
Is your grid connection a fixed cost dragging down your bottom line, or a tradable asset generating revenue?
Sunk Cost.
- Unpredictable Spot Prices
- Peak Demand Charges
- Zero Backup Protection
Managed Asset.
- Arbitrage Energy Markets
- Flatten Demand Peaks
- FCAS Revenue Streams
ROI typically 3-5 years for commercial systems > 200kWh

Community Energy
Support local grid stability in high-penetration solar zones. Manage voltage constraints and defer network upgrades.

Mining & Remote
Displace expensive diesel generation in off-grid camps. Engineered for high-ambient temperatures and remote reliability.

Agri-Industrial
Secure power for seasonal processing and cold storage. Manage peak demand charges without grid upgrades.

Commercial & Industrial
Support nominated critical automation with a correctly engineered UPS and backup design. Transfer performance depends on the selected inverter, controls, protection, and load.
Evidence Snapshot
HC-125K-261-02B commercial storage.
Published product evidence
HC-125K-261-02B commercial BESS
A liquid-cooled cabinet at 125 kW / 261.25 kWh. Parallel 1–8 cabinets to cover ~200 kWh–2 MWh. Review the product warranty for terms, performance limits, and conditions.
- Model
- HC-125K-261-02B
- Nominal rating
- 125 kW / 261.25 kWh
- Initial usable energy
- 235.125 kWh
- Thermal and safety
- Liquid cooling; integrated fire detection and suppression
The Heavy Lifter.
Scalable, liquid-cooled energy storage for demanding industrial applications.

HC-125K Cabinet
A liquid-cooled 125 kW / 261.25 kWh BESS. Parallel 1 to 8 cabinets — ~200 kWh–2 MWh.

Liquid Cooled
Advanced thermal management ensures consistent cell temperature for maximum cycle life in harsh Australian heat.

Open Protocol
Native Modbus TCP/IP support. Integrates with your BMS or VPP out of the box.

High Density Safety
Integrated fire suppression and LiFePO4 cells pack more energy into less space.
HC-125K-261-02B
High-density, liquid-cooled commercial BESS. One cabinet, or up to eight in parallel.
Commercial and grid-edge decision guides
All guides- Commercial Battery Storage in Perth: 50–200 kWh Sizing 2026
- Battery Backup for Perth Hills & Fringe-of-Grid WA 2026
- 48V vs High-Voltage Battery Systems: Which Is Right for Your Site?
- LiFePO4 Battery Pack SoH: What the Percentage Actually Proves
- Active vs Passive Cell Balancing in LiFePO4 Batteries
- Pack-Level BMS Integration: What to Demand Before You Buy a Lithium Battery (2026)
Industrial Reliability.
Grid Ready.
Secure your operations with market-leading energy density and reliability.
Enquire Now